University of the
Pacific Library
3601 Pacific Avenue
Stockton, CA 95211
Information:
(209) 946-2431
| Library Media Studio Survey Please take a few moments to fill out a survey about the library's multimedia studio...[More] Posted Thu, May 07 2009 |
| New Database Trials Check out Mergent Online and Mergent InvestorEdge, two databases now available on a trial basis...[More] Posted Mon, April 27 2009 |
| New Book Displays Up: Asian Pacific Islander / Gender and the Performing Arts! Wonderful displays in celebration of Asian Pacific Islander Month and the upcoming Gender and the Performing Arts Festival!..[More] Posted Thu, April 16 2009 |
| University Library opens 24/7 for School of Pharmacy Finals The University Library is reinstating 24/7 for 2009 School of Pharmacy finals...[More] Posted Fri, April 03 2009 |
This is an older update -- Read the latest update
The new library wing is complete and in use. However, the library is still in transition as we continue to renovate and improve each section. Just visit the circulation desk if you need help locating materials while we're in transition.There are free earplugs at the circulation desk and we can check out earphones at both the circulation desk and the music/av desk.
Thank you for your patience and understanding as we continue to renovate and improve your library!
This is an older update -- Read the latest update

The journal collection is being divided by publication date.
The book collection is being divided by publication date.
The remaining part of the collection will be moved as shelving becomes available. Circulation personnel are available to help you locate materials at any time.

The Martin Wing (across from the main circulation desk) is being transformed at this time. A group viewing room is being created and a listening/viewing room is being built. Upon completion, Music/AV and Circulation will merge and there will be one service point. The Circulation desk will then be in this newly renovated area.
Four new study rooms are also being completed and a new copy room is being constructed.

The truly exciting news is that the café/sitting/eating area is being built this summer – a year earlier than planned! It will be where the current circulation desk area is located. A new electronic display area will be constructed where the current lobby bulletin board currently resides. The back offices will be renovated at this time and 2 new offices and a conference room will be created.